Paper Mill Playhouse Renovation

Paper Mill Playhouse

Transformative Interventions Elevate This Local Theater Dubbed “Broadway in Your Backyard”

Paper Mill Playhouse Renovation

Paper Mill Playhouse

Millburn, NJ

Theater renovation and addition: 28,000 SF
Carriage house renovation and addition: 6,000 SF

the opportunity

KSS Architects partnered with Paper Mill Playhouse to re-envision front and back of house and outdoor spaces in support of the theater’s mission to be the premier musical theater in the country. An initial study determined that a traditional renovation would not solve issues of access, undesirable event space, and dysfunctional back of house caused by a confluence of factors including several renovations over time, an uninspiring arrival experience, and a disconnected exterior expression. The team conceptualized a hybrid rebuild and renovation in which the front of house and a portion of back of house space are rebuilt and the remaining existing back of house is renovated.

Our Approach

The design for the new face of Paper Mill Playhouse features a modern façade with extensive glazing which offers views inward to the activity within, and outward to the plaza and nature beyond. The roofline of the new pavilion gestures toward the adjacent historic carriage house and natural materials in warm tones create a shared architectural language among the two structures. On the interior, an open double-height lobby and gracious monumental stair establish physical and visual connections between floors. Ample milling space improves circulation and patron experience while new and renovated back of house spaces increase efficiencies for performers and staff. The result of this design is a reinvigorated theater experience befitting Paper Mill Playhouse’s vibrant community.

Program

Front of house, plaza, double-height lobby/milling area, patron’s lounge, orchestra green room, box office, concessions, back of house, administration offices, catering area, musician lounge, practice rooms, dressing rooms, storage, receiving and assembly spaces, costume shop, crew office/lounge, AV shops/storage

Mark S. Hoebee, Producing Artistic Director and Mike Stotts, Executive Director
As stewards of this theater, we are committed to ensuring Paper Mill remains a cornerstone of our community for generations to come. The Next Act Campaign is essential to that vision. The renovations will not only preserve the rich history of our theater and surrounding campus but will greatly enhance the experience for our patrons and artists alike. These necessary upgrades will allow us to create a more welcoming and accessible environment.

"Paper Mill Playhouse Launches the Next Act Campaign." New Jersey Stage, 4 November 2024

>
Partners

Tate Design Group
Harrison-Hamnett, Structural
CMTA, MEP/FP and Acoustical Engineering
Dynamic Engineering Consultants, Civil
Metinteractive, AV/IT
Corsi Associates, Food Service
Phelps Construction Group, Contractor